中文
中文
Construction time: June 17, 2018 - March 30, 2019
Building area: 27,600㎡
Clean area: 10,000㎡
Cleanliness level: Class 10 - 1,000
Scope of contracting: BP plant secondary distribution
Project highlights:The Mianyang G6 Flexible AMOLED Production Line Project is the second flexible production line of BOE, which is also a key step of BOE's realization of its strategic layout of flexible displays. The total investment of this production line is planned to be RMB 46.5 billion.
Industry value:this project is one of the most advanced flexible OLED panel production lines in China.
![]() |
![]() |
Aerial view | Aerial images |
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building