中文
中文
Construction time: April 8, 2016 - August 25, 2016
Building area: 5,800㎡, Clean area: 500㎡
Cleanliness level: Class 100,000
Scope of contracting: building decoration, water supply, drainage and heating, ventilation and air conditioning, building electrical engineering, intelligent building, building energy saving, and clean engineering in this project
Project highlights:this project is invested by the municipal government and the actual user is InnoCare Pharma Limited, which was jointly founded by Shi Yigong, President of Tsinghua University. Its biological laboratory is mainly used to research and develop molecularly targeted drugs for the treatment of cancer and autoimmune diseases. At present, it has been listed in Hong Kong.
![]() |
![]() |
Aerial view |
Live view of the project |
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building