中文
中文
Project location: Daxing, Beijing
Project time: 2019
Service content: CD+BD+DD
Building area: 2,600㎡
Project introduction: Beijing Fresenius Kabi's new automatic stereoscopic warehouse project is a new GMP warehouse, with high requirements for temperature and humidity environment. The project adopts three sets of double-extension stacker cranes and 11 rows or racks, which can provide about 8,500 goods sections, with fully automatic access to goods. It maximizes the use of the whole area of the plant.
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building