中文
中文
Construction unit: Jiawei Long Power
Design content: construction drawing design
Construction scale: Building area: 13,252㎡
Project introduction: the cleanroom, electromechanical installation and decoration engineering of plants 1# and 2# of Jiawei Long Power's new high-end li-ion secondary battery and cell project with an annual output of 1.4 billion wh
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building