Shandong Zaozhuang Geely Xinwangda Power Battery Phase I Project
Construction period: July 2022 to December 2022
Building area: 174100m²
Clean area: 132000m²
Contracting mode: Construction general contracting
Service content: Civil engineering decoration, purification decoration, HVAC, piping, electrical, secondary process distribution, intelligence (air conditioning self-control)
Product: Production, assembly, formation, settling, module, etc. of lithium battery cells
Industry value: The production line of Shandong Geely Xinwangda Power Battery Co., Ltd. adopts the latest 5.9Ah high-power HEV battery cells with 1.9kWh energy; Adopting liquid cooling to meet the working environment of minus 35-55 degrees Celsius, the integrated structure of the module and liquid cooling system has high thermal conductivity. It has built 10 production lines, 3 BEVs+7 HEVs, and can achieve an annual output of 11GWh/year of electricity. The product is mainly used by Geely to create a new second-generation HEV hybrid system with all independent intellectual property rights, which can be widely applied to multiple models such as Lynk&Co, Geely, Volvo, etc. It has the characteristics of low fuel consumption, low emissions, and high performance.
Milestone significance: The cooperation between China Electric Power Second Company and Xinwang Daxinxin Co., Ltd. has been elevated, and the original cooperation content has been expanded from mechanical and electrical purification and HVAC to civil engineering and mechanical and electrical purification, tending towards EPC cooperation mode.
Project highlights: Due to the impact of the epidemic, the project has a tight schedule and adopts prefabrication in multiple aspects. Materials are pre ordered in advance to ensure the smooth progress of the overall project and guarantee the construction period;
During the construction period, multi zone cross construction was adopted, which further improved the construction speed and exercised the ability to organize construction management.