Xinwangda New Energy Nanchang Park Phase 2.1 Factory Building 13 # -2, 13 # -3 Decoration Project
Construction period: December 20, 2021 to May 10, 2022
Building area: 65626 m²
Clean area: 50000 m²
Cleanliness level: up to 10w level
Contracting scope: Mechanical and electrical installation of buildings 13 # -2 and 13 # -3 in Phase 2.1 of Xinwangda New Energy Nanchang Park.
Project highlights: This project includes the procurement, supply, transportation (including secondary transportation), unpacking and unloading, insurance, warehousing, positioning, installation and commissioning, trial operation, cooperation and acceptance, defect liability period, quality assurance period, and other related services for the corresponding clean room and general electromechanical systems. The system includes but is not limited to: clean room environmental system, clean room air conditioning treatment system, non clean area air conditioning system, process exhaust system, water supply and drainage system, process chilled water system, process vacuum system, compressed air system, nitrogen system, steam system, electrolyte pipeline system, equipment power distribution system, dehumidifier, air conditioning equipment power distribution system, general power distribution system, lighting system, building and decoration system, etc.
Industry value: Xinwangda Electronics Co., Ltd. is a high-tech enterprise mainly engaged in the research and development, design, production, and sales of lithium-ion battery modules. It is a leading provider of lithium-ion battery module solutions and products in China and a leading semiconductor manufacturing service enterprise in China. It is the leader in the new energy lithium battery industry in China.
Aerial view
Construction of cleanroom interior
Construction of cleanroom interior
Interior view of power distribution room