中文
中文
Construction unit: Chuzhou HRmicro Electronics Technology Co., Ltd.
Project location: Nanqiao District, Chuzhou, Anhui
Service content: scheme design, construction drawing design
Project investment: RMB 1 billion
Construction scale: occupied area: 100 mu; total building area: 65,000㎡; Cleanroom area: 8,000㎡
Construction period: November 2020 - October 2021
Project product: 6-inch power device chips
Project capacity: 60K pieces/month
400 892 1298
苏ICP备15056857号-1 Enterprise Post Office
COPYRIGHT©ALLRIGHTSRESERVED.China Electronics System Engineering No. 2 Construction Co., Ltd.
Business Scope
Corporate Culture
Party Building